Baha Mar Chilled Water
ISD was contracted in the amount of $1,300,000ISD was subcontracted by CCA Bahamas Ltd. to install 3,200ft of massive pipeline for the resort’s pre-insulated chilled water pipe system. The pipeline ran from the Central Utility Plant building to the hotels’ distribution system for the AC System (Supply and Return Piping). Installation of the pre-insulated 28″ HDPE (DR11 butt fusion) pipe required trenching of 10,000 cubic yards within the vicinity of the Baha Mar hotel towers. |