Baha Mar External Works

ISD was contracted in the amount of $34,000,000

ISD as part of a joint venture, was contracted to carry out various projects at Baha Mar. ISD scope included the complete area development around the Baha Mar hotels including earthworks, structural concrete works, bridges, hardscape, water features, and underground utilities such as drainage, water main, reclaim, force main, major and minor lift stations, cooling wells, electrical and telecom.

 Earthwork and Utilities – ISD scope of works included earthworks and underground utilities – fully functional system for Potable Water, Sewer, Drainage, Electrical and Telecommunications (conduits, panels, transformers, etc), Gas, Cooling Wells, supply and return Chill Water system, Reuse water, major & minor lift stations.

Hardscape – ISD was contracted to install resort style hardscape  for 3 porte cocheres, as well as pedestrian  paths  around  the  hotels,  entry  lake,  Convention  Center,  and  Central  Utility  Plant.  The  types  of  material  included  natural  stone  pavers,  wood  boardwalk,  color  imprinted  and  stamped  concrete,  and  colored  embossed  concrete  as  weathered wood planks with wood grain texture and  visible nail heads.

Baha Mar Limited awarded ISD an additional $1 Million contract for the screening of unsuitable soils for use as topsoil for the landscape of the resort. This included the haulage of 35,000 yards of topsoil and the screening of 75,000 yards by ISD’s owned and operated screening plant.

CONTACT US

Please use this contact form to contact us directly. Your contact is very important to us and we will get back to you ASAP!

Sending

21st Century Road  -  P. O. Box SP-63796  -  Nassau, Bahamas  -  Ph: 242.328.2025  -  Fax: 242-601-0147  -  info@isdbahamas.com

©2017 ISD BAHAMAS. All rights reserved. Designed by Chuck Fox - Foxtech Bahamas 

Log in with your credentials

Forgot your details?