Baha Mar
Lake Bridge

Project value: $34M

As part of the joint venture contract to perform works at Baha Mar, ISD’s scope included the Design-Build of the entry lake as well as the installation of its show fountains. Works included:

-4,000cu. yd. of marine grade concrete walls with stone facing and wall caps

-12,000ft. of HDPE pipes, 8” to 24”

-Rock from Dominican Republic

-Concrete coatings for underwater effect

-Three pedestrian bridges

-233ft. boardwalk

-Electrical and control systems for operation of underwater fountains

-Installation of the lake filtration system

 

Let’s sit down
and talk about
your vision


Contact us.