Perfect Day at CocoCay
Phase 1

Project value: $66M

ISD was contracted to carry out the following scope of works for the development of the tourist destination island, CocoCay. Works included:

  • Heavy earthworks
  • Construction of various concrete and wood buildings/structures, including:

    o Back of house facilities such as the generator building, commissary building, waste water treatment plant, staff housing, etc., of various sizes ranging from 200–15,000 square feet.
    o Front of house restaurants and tourist facilities
    o Concrete foundation/bases for the slides and light bases
  • Installation of all utilities for the site including potable water, sewer, drainage, electrical and telecommunications.
  • Construction of port facility for island.
  • Demolition of existing structures to accommodate new structures.
  • Installation of 3no. 2 MegaWatt Generators to power the entire island.
  • Installation of site wide utilities.
  • Construction of structural elements throughout the entire site, including concrete foundations, walls, etc.

 

Let’s sit down
and talk about
your vision


Contact us.